⚠ ENERGEN-STAGING ENVIRONMENT — TEST SYSTEM

View scenario configuration

Financial Modelling

Scenario name

System Components

Grid connection

?
?

Commercial energy prices

Import

Electricity purchased from the grid.

Pricing type
Spot price (Day-Ahead) plus surcharge and grid fee
?
?
Import price = day-ahead price + trader surcharge + grid fee
Export

Electricity sold or valued on export.

Pricing type
Spot price (Day-Ahead) with optional discount
?
Export price = day-ahead price - export discount

Solar PV

Define the installed PV capacity. Location is prefilled from the site country and can be adjusted if needed.

?

Battery storage

Define the size of the battery. Operational participation will be evaluated automatically in multiple potential cases.

?
?

Investment costs ?

Enter investment cost components for this scenario. If no investment for a specific component is needed, you can leave it blank or enter 0.

Battery system
PCS / inverter
EMS / controls
PV system
Load metering / integration
Grid connection
Civil installation
Engineering / permitting

Electricity consumption

Electricity consumption uploads are disabled in view-only mode.